NOTICE TO WATER USERS

The applications below were filed with the Division of Water Rights. These are informal proceedings per Rule 655-6-2. Protests concerning an application must be legibly written or typed, contain the name and mailing address of the protesting party, STATE THE APPLICATION NUMBER PROTESTED, CITE REASONS FOR THE PROTEST, and REQUEST A HEARING, if desired. Also, A $15 FEE MUST BE INCLUDED FOR EACH APPLICATION PROTESTED. Protests must be filed with the Division of Water Rights on or before Sep. 14, 2021 either electronically using the Division`s on-line Protest of Application form, by hand delivery to a Division office, or by mail at PO Box 146300, Salt Lake City, UT 84114-6300. Please visit waterrights.utah.gov or call (801)538-7240 for additional information.

EMERY COUNTY
EXTENSION(S)
94-285 (A44305): Bronco Utah Operations LLC is/are filing an extension for 1.76 cfs from groundwater (Walker Falt Quad) for INDUSTRIAL: Industrial processing of coal and hydraulic transportation of coal; STEAM GENERATION; MINING.

Teresa Wilhelmsen, P.E.
State Engineer

Published in the ETV Newspaper August 18 and August 25, 2021.

scroll to top