The applications below were filed with the Division of Water Rights. These are informal proceedings per Rule 655-6-2. Protests concerning an application must be legibly written or typed, contain the name and mailing address of the protesting party, STATE THE APPLICATION NUMBER PROTESTED, CITE REASONS FOR THE PROTEST, and REQUEST A HEARING, if desired. Also, A $15 FEE MUST BE INCLUDED FOR EACH APPLICATION PROTESTED. Protests must be filed with the Division of Water Rights on or before Feb. 1, 2022 either electronically using the Division`s on-line Protest of Application form, by hand delivery to a Division office, or by mail at PO Box 146300, Salt Lake City, UT 84114-6300. Please visit waterrights.utah.gov or call (801)538-7240 for additional information.
EMERY COUNTY
NEW APPLICATION(S)
92-689 (F83023): Bridgett Hatfield, William J. Hatfield Jr propose(s) using 2.25 cfs OR 78.72 ac-ft. from the Green River and pond (Green River) for IRRIGATION; INDUSTRIAL: Mineral processing.
UTAH COUNTY
CHANGE APPLICATION(S)
91-5286 (a47993): Robert Baird, Price River Water User`s Association propose(s) using 1.0096 ac-ft. from groundwater (Solider Summit) for IRRIGATION; OTHER: Evaporation and fish culture.
Teresa Wilhelmsen, P.E.
State Engineer
Published in the ETV Newspaper January 5 and January 12, 2022.