Southeastern Utah Weekly UDOT Construction Update

f5564d3515aba744065b44b196ea6e3a.jpg

Emery County

В 

I-70, West of Green River

Contract:

Staker Paving & Construction

Amount:

$5,243,024

Location:

Mileposts 138 to 141 and 153 to 155

Impact:

* Single lane closures possible in each direction.

Activity:

* Guardrail installation.

* Stripe painting.

* Rumble strips.

* Erosion control.

В 

Grand County

В 

U.S. 191, Moab to State Route 279

Contract:

W.W. Clyde & Co.

Amount:

$6,451,900

Location:

Between 400 North and Potash Road, Moab

Impact:

* Minimal traffic impact.

Activity:

* Turn lane work at the S.R. 128 junction.

* Hauling material north of the Colorado River Bridge at courthouse wash.

В 

scroll to top