Separate sealed BIDS will be received by Castle Valley Special Service District for the construction of the: Orangeville Chip Seal Project 2019 at the office of Castle Valley Special Service District – until 2:00 pm, February 20, 2020, and then opened and publicly read aloud
A bid bond in the amount of five percent (5%) of the bid, made payable to the Owner, will accompany the Bid.
Major Items of work include:
1. Type ‘A’ Cover Material – 293,600 Sq. Yd.
2. LM-CRS-2H – 560 Ton
3. Flush Coat CCS-1 – 130 Ton
Prospective bidders shall assemble at Castle Valley Special Service District’s Office, located at 20 South 100 East in Castle Dale, on February 13th, 2020, at 2:00 p.m., for the group showing.
Attendance at the project pre-bid meeting and site-visit is mandatory and a prerequisite to submitting a bid for the project. Bidding Contractors, or a duly authorized representative, must arrive at Castle Valley Special Service District’s Office for the pre-bid meeting and site-visit, at 20 South, 100 East in Castle Dale, Utah 84513.
The Owner reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the District.
The CONTRACT DOCUMENTS may be examined at the following location: Engineer’s Office: Johansen & Tuttle Engineering, Inc., 90 South 100 East, Castle Dale, Utah 84513.
Contract documents may be obtained at the Pre-bid meeting upon a non-refundable payment of $100.00. The $100.00 fee will provide both a hard copy and electronic copy of the project drawings and specifications.
January 29, 2019
Date
Brad Giles – Chairman
CVSSD
Published in the ETV Newspaper on January 29, February 5, February 12 and February 19, 2020.