ADVERTISEMENT FOR BIDS – NOTICE TO CONTRACTORS

Project Owner:
Castle Dale City
P.O. Box 728
Castle Dale, Utah 84513

Separate sealed BIDS for the construction of the Castle Dale City Bike Trail Project, 2023 will be received by Castle Dale City at the office of the Engineer: Johansen & Tuttle Engineering, 90 South 100 East, PO Box 487, Castle Dale, UT 84513 until 2:00 p.m., March 15 , 2023, and then opened and publicly read aloud.

A bid bond in the amount of five percent (5%) of the bid, made payable to the Owner, shall accompany the Bid.

Major items of work:
1. Granular Borrow 3,000 C.Y.
2. Untreated Base Course 1,210 C.Y.

This project is funded in whole or in part by a grant through the U.S. Department of Housing and Urban Development (HUD) Community Development Block Grant (CDBG) program. The contractor will be required to comply with all federal labor standards and attendant laws, including the payment of the most current Davis-Bacon wages and compliance with Section 3 to provide employment opportunities for lower income persons and small businesses. Local, minority and woman owned business owners are encouraged to bid. The lowest responsible bidder will be selected.

The Owner reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the City.

Prospective bidders may assemble at the Johansen & Tuttle Engineering at 90 South 100 East, Castle Dale, Utah on March 8 , 2023, at 2:00 p.m., for the group showing.

Attendance at the project pre-site-show meeting and site-show is mandatory and a prerequisite to submitting a bid for the project. Bidding Contractors, or a duly authorized representative, must arrive at the site for the said meeting and site-showing.

The CONTRACT DOCUMENTS, including Davis Bacon Wage Decision information may be examined at the following location: Engineer’s Office: Johansen & Tuttle Engineering, Inc., 90 South 100 East Castle Dale, Utah 84513. Contract documents may be obtained at the pre-bid meeting upon a non-refundable payment of $100.00.

The fee will provide a hard copy and electronic copy of the project drawings and specifications.

March 1, 2023
Date

Danny VanWagoner
Mayor

Published in the ETV Newspaper March 1, March 8 and March 15, 2023.

scroll to top