NOTICE

A Notice of Intent for the following project submitted in accordance with R307-401-1, Utah Administrative Code (UAC), has been received for consideration by the Director:

Company Name: Price River Energy, LLC

Location: Price River Energy, LLC – Gordon Creek Compressor Facility – SE/4 Sec. 32 T13S R8E, Price, UT

Project Description: Price River Energy, LLC has requested changes to their permit for a compressor station facility in Carbon County. The facility has requested a change that removes two (2) currently-permitted compressor engines rated 1,293 hp each. These two (2) engines will be swapped out for a single engine rated 637 hp. The engine will be controlled with oxidation catalysts. As a result of this requested change, permit conditions were updated to establish limits on emissions from the 637 hp engine. The language used in the existing permit was updated as well.

The completed engineering evaluation and air quality impact analysis showed the proposed project meets the requirements of federal air quality regulations and the State air quality rules. The Director intends to issue an Approval Order pending a 30-day public comment period. The project proposal, estimate of the effect on local air quality and draft Approval Order are available for public inspection and comment at the Utah Division of Air Quality, 195 North 1950 West, Salt Lake City, UT 84116. Written comments received by the Division at this same address on or before January 14, 2022 will be considered in making the final decision on the approval/disapproval of the proposed project. Email comments will also be accepted at dfrederick@utah.gov. If anyone so requests to the Director in writing within 15 days of publication of this notice, a hearing will be held in accordance with R307-401-7, UAC.

Under Section 19-1-301.5, a person who wishes to challenge a Permit Order may only raise an issue or argument during an adjudicatory proceeding that was raised during the public comment period and was supported with sufficient information or documentation to enable the Director to fully consider the substance and significance of the issue.

Date of Notice: December 15, 2021

Published in the ETV Newspaper December 15, 2021.

scroll to top