NOTICE TO CONTRACTORS

Project Owner:
Muddy Creek Irrigation Company
P.O. Box 104
Emery, Utah 84522

Notice for Bidders:
Separate sealed BIDS for the construction of Muddy Creek – Independent Canal Pipeline Installation, will be received by Muddy Creek Irrigation Company at the office of the Engineer, Johansen & Tuttle Engineering until 2:00 pm, April 4, 2019. Location: Johansen & Tuttle Engineering, Inc., 90 South 100 East, Castle Dale, Utah 84513

Major items of work include:

1. 30-Inch IPS HDPE DR-26 Pipe – 9,450 L.F.

2. 30-Inch IPS HDPE DR-21 Pipe – 11,250 L.F.

3. 36-Inch Highway Bore Crossing – 250 L.F.

Prospective bidders shall assemble at Johansen & Tuttle Engineering, March 26, 2019, at 10:00 a.m., for the pre-bid meeting.

Attendance at the project pre-bid meeting and site-visit is mandatory and a prerequisite to submitting a bid for the project. Bidding Contractors, or a duly authorized representative, must arrive at the Project Engineer’s office for the pre-bid meeting and site-visit at Johansen & Tuttle Engineering, 90 South 100 East, Castle Dale, UT 84513.

The CONTRACT DOCUMENTS may be examined at the following location: Engineer’s Office: Johansen & Tuttle Engineering, Inc., 90 South 100 East, Castle Dale, Utah 84513.

Contract documents may be obtained at the pre-bid meeting upon a non-refundable payment of $100.00.

The fee will provide a hard copy and electronic copy of the project drawings and specifications.

March 13, 2019 Morris Sorensen, President

Date Muddy Creek Irrigation Company

Published in the ETV Newspaper March 13, 20 and 27, and April 3, 2019.