NOTICE TO WATER USERS

The applications below were filed with the Division of Water Rights. These are informal proceedings per Rule 655-6-2. Protests concerning an application must be legibly written or typed, contain the name and mailing address of the protesting party, STATE THE APPLICATION NUMBER PROTESTED, CITE REASONS FOR THE PROTEST, and REQUEST A HEARING, if desired. Also, A $15 FEE MUST BE INCLUDED FOR EACH APPLICATION PROTESTED. Protests must be filed with the Division of Water Rights on or before Mar. 30, 2021 either electronically using the Division`s on-line Protest of Application form, by hand delivery to a Division office, or by mail at PO Box 146300, Salt Lake City, UT 84114-6300. Please visit waterrights.utah.gov or call (801)538-7240 for additional information.

CARBON COUNTY
EXTENSION(S)
91-239 (A29261): City of Sunnyside is/are filing an extension for 3500 ac-ft. (6 Miles East of Sunnyside) for MUNICIPAL: In Sunnyside.

EMERY COUNTY
NEW APPLICATION(S)
91-5272 (A82412): MJCorr LLC dba Shady Acres propose(s) using 6 ac-ft. from groundwater (Green River) for IRRIGATION.
91-5273 (F82413): MJCorr LLC dba Shady Acres propose(s) using 16.2 ac-ft. from groundwater (Green River) for IRRIGATION. 

Teresa Wilhelmsen, P.E.
State Engineer  

Published in the ETV Newspaper March 3 and March 10, 2021.

scroll to top