Emery County School District is now accepting PROPOSALS for Parking Lot/Loading zone Paint for three schools; Castle Dale Elementary (Parking Lot), Ferron Elementary (Guide Traffic Lines and Bus Zone) and San Rafael Middle School (Curb).
Mandatory pre-bid walk-through is required. Initial District walk thru will be held on Monday, March 20, 2023, beginning at 9 a.m at Castle Dale Elementary (Castle Dale, Utah) then travel to Ferron Elementary (Ferron, Utah) then to San Rafael Middle School (Ferron, Utah). Other dates may be entertained upon request. Installer must Field Verify All Requirements, Square Footage, Locations, Product code, and Product supplies.
Bid opening will be March 30, 2023 at 8:00 a.m. at Emery County School District Maintenance Office in Castle Dale, Utah.
Proposal(s) may be mailed, delivered, or faxed to Kerry Lake. Proposals must be received on or before March 29, 2023 at 4 p.m. Emery School District reserves the right to accept or reject any or all submittals or to waive any informality or technicality in any submittal in the interest of the School District. Owner reserves the right to accept or reject any proposal if determined to be in the best interest of the School District.
Questions and Bids may be directed to:
Kerry Lake, Building Construction Supervisor
Emery County School District
Phone: (435) 381-5280
Cell: (435) 749-2555
FAX: (435) 381-5684
100% Material Payment, Performance Bond and 5% Bid Bond is required.
Published in the ETV Newspaper March 8 and March 15, 2023.