Emery County School District is now accepting PROPOSALS for PARKING LOT RENOVATION, including, DEMOLITION, GRADING, CONCRETE and ASPHALT at Emery High School. Approximate square footage of 13,000 sqft of asphalt and 200 linear feet of curb and gutter; all measurements must be field verified.
Mandatory pre-bid walk-through is required. Initial District walk thru will be held on Thursday, May 11, 2023, beginning at 1 p.m. at Emery High School (Castle Dale, Utah). Other dates may be entertained upon request. Installer must Field Verify All Requirements, Square Footage, Locations, Product code, and Product supplies. Plans will be available on May 8th, 2023, contact Wayne Maxfield or email Megan Durrant for a copy of documents.
Bid opening will be May 18, 2023 at 8:00 a.m. at Emery County School District Maintenance Department, Castle Dale, Utah.
Proposal(s) may be mailed, delivered, or faxed to Wayne Maxfield. Proposals must be received on or before May 17, 2023 at 4 p.m. Emery School District reserves the right to accept or reject any or all submittals or to waive any informality or technicality in any submittal in the interest of the School District.
Questions and Bids may be directed to:
Wayne Maxfield, Building Construction Supervisor
Emery County School District
Phone: (435) 381-5280
Cell: (435) 749-1162
FAX: (435) 381-5684
100% Material Payment, Performance Bond and 5% Bid Bond is required.
Published in the ETV Newspaper April 26 and May 3, 2023.