Emery County School District is now accepting PROPOSALS to remodel the shower room, replace plumbing and remove and install fixtures. Locations; Green River High School (Green River, Ut). Mandatory pre-bid walk through is required. District walkthrough will begin at 1 p.m. on Monday, February 24, 2020 at Green River High School. Installer must Field Verify All Requirements, Placement Locations, and Materials.
Bid opening will be March 12, 2020 at 10:00 a.m. at the School Board Office in Huntington.
Proposal(s) may be mailed, delivered, or faxed to Kerry Lake. Proposals must be received on or before March 11, 2020 at 4 p.m. Emery School District reserves the right to accept or reject any or all submittals or to waive any informality or technicality in any submittal in the interest of the School District. Owner reserve s the right to accept or reject any proposal if determined to be in the best interest of the School District.
Questions and Bids may be directed to:
Kerry Lake, Building Construction Supervisor
Emery County School District
Phone: (435) 381-5280
Cell: (435) 749-2555
FAX: (435) 381-5684
100% Material Payment, Performance Bond and Bid Bond is required.
Published in the ETV Newspaper on February 5 and 12, 2020.