Project Owner:
EMERY WATER CONSERVANCY DISTRICT
P.O. Box 998
Castle Dale, Utah 84513
Separate sealed BIDS for the construction of the CC&H Canal Pipeline Installation Project, 2022 will be received by Emery Water Conservancy District at the office of Engineer: Johansen & Tuttle Engineering until 2:00 p.m. August 24 , 2022, and then opened and publicly read aloud.
A bid bond in the amount of five percent (5%) of the bid, made payable to the Owner, shall accompany the Bid.
Major items of work:
1. 66-Inch Reinforced Concrete Pipe (Installation Only) – 1,600 L.F.
The Owner reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the District.
Prospective bidders shall assemble at the office of Engineer, Johansen & Tuttle Engineering, August 17, 2022, at 10:00 a.m., for the group showing.
Attendance at the project pre-site-show meeting and site-show is mandatory and a prerequisite to submitting a bid for the project. Bidding Contractors, or a duly authorized representative, must arrive at the District’s office for the said meeting and site-showing, Emery Water Conservancy District, 20 South 100 East, Castle Dale, Utah.
The CONTRACT DOCUMENTS may be examined at the following location: Engineer’s Office: Johansen & Tuttle Engineering, Inc., 90 South 100 East – Castle Dale, Utah 84513. Contract documents may be obtained at the Site Show upon a non-refundable payment of $100.00. The $100.00 fee will provide a hard copy and electronic copy of the project drawings and specification.
August 10, 2022
Date
Jay Mark Humphrey, Manager
EWCD
Published in the ETV Newspaper August 10, August 17 and August 24, 2022.